CONSTRUCTIVE PROCESSES SUITABLE TO DIFFERENT DEVELOPMENTS

Postado em 09/28/2009 por admin

Working in a more sustainable and less harmful to the environment. A constructive proposal of Alliance for all its developments is giving results that can be perceived in a brief visit to the construction sites of the company.
Within a proposal to build more efficient, the Alliance has developed projects that allow to save resources like energy, water and building materials, in addition to ongoing concern about the ultimate fate of debris generated.
To better manage work processes, the company works with the philosophy of “Lean Construction”, ie works leaner, where tasks that do not add value should be reduced or even eliminated.
The company seeks a gradual improvement in the reduction of losses in the construction of buildings. “It is important to emphasize that the process of streamlining the hiring of projects it is essential to specification required for each step of the work. Some projects and consultancies that were not highlighted today are employed and implemented in our beds, such as window frames, masonry, waterproofing and coating, “explains the engineer company, Angelo Rocci.
According to the engineer, in the national and international scene there are numerous building systems, it is the company together with designers who advise the project to define the most compatible with each development.
For example, the work of Luxor Tambaú system was used to partition the inside walls of gypsum blocks, ideal for a flat. This made the venture more versatile, both in reducing the execution times, as the solution of the modifications requested by customers.
In the overseas Residence Club Class, the system adopted is that of ceramic blocks of high quality, run as masonry project. To ensure waste “zero”, the walls are designed to break and no adjustments of elements. “Each project is treated different. We studied the feasibility of each project and apply the appropriate solutions, “said Angelo Rocci.
Moreover, the construction processes more rational benefit much the end customer. Besides all of the work schedule be established and enforced in accordance with the initial planning, giving more security with the purchase of development, the economy generated with the correct use of the materials is reversed within the work itself to the application of basic line without increasing construction costs.
Challenge – The construction industry looks more closely at environmental issues. Download a few percentage points in the loss of construction also means reducing the extraction of raw materials. The waste also feeds the production of the heap. Research indicates that the remains of the building represent mass, around two thirds of all waste generated in the urban area of big cities.
Lean Construction – Based on engineering and production model developed by Toyota, establishing efficient processes and promotes a significant reduction of losses during construction. Its implementation has brought excellent results in increased productivity and profitability in construction companies. Lean Construction favors the development of products and services of high quality, lower cost and in less time (lead time) possible.

Working in a more sustainable and less harmful to the environment. A constructive proposal of Alliance for all its developments is giving results that can be perceived in a brief visit to the construction sites of the company.

Within a proposal to build more efficient, the Alliance has developed projects that allow to save resources like energy, water and building materials, in addition to ongoing concern about the ultimate fate of debris generated.

To better manage work processes, the company works with the philosophy of “Lean Construction”, ie works leaner, where tasks that do not add value should be reduced or even eliminated.

The company seeks a gradual improvement in the reduction of losses in the construction of buildings. “It is important to emphasize that the process of streamlining the hiring of projects it is essential to specification required for each step of the work. Some projects and consultancies that were not highlighted today are employed and implemented in our beds, such as window frames, masonry, waterproofing and coating, “explains the engineer company, Angelo Rocci.

According to the engineer, in the national and international scene there are numerous building systems, it is the company together with designers who advise the project to define the most compatible with each development.

For example, the work of Luxor Tambaú system was used to partition the inside walls of gypsum blocks, ideal for a flat. This made the venture more versatile, both in reducing the execution times, as the solution of the modifications requested by customers.

In the overseas Residence Club Class, the system adopted is that of ceramic blocks of high quality, run as masonry project. To ensure waste “zero”, the walls are designed to break and no adjustments of elements. “Each project is treated different. We studied the feasibility of each project and apply the appropriate solutions, “said Angelo Rocci.

Moreover, the construction processes more rational benefit much the end customer. Besides all of the work schedule be established and enforced in accordance with the initial planning, giving more security with the purchase of development, the economy generated with the correct use of the materials is reversed within the work itself to the application of basic line without increasing construction costs.

Challenge – The construction industry looks more closely at environmental issues. Download a few percentage points in the loss of construction also means reducing the extraction of raw materials. The waste also feeds the production of the heap. Research indicates that the remains of the building represent mass, around two thirds of all waste generated in the urban area of big cities.

Lean Construction – Based on engineering and production model developed by Toyota, establishing efficient processes and promotes a significant reduction of losses during construction. Its implementation has brought excellent results in increased productivity and profitability in construction companies. Lean Construction favors the development of products and services of high quality, lower cost and in less time (lead time) possible.


No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URL

Leave a comment


Rua Poeta Targino Teixeira, 60 - Altiplano - João Pessoa - Paraíba
CEP: 58046-380 - Fone: (83) 3533-3333
Qualitare Agência de Internet